PORTFOLIO

Christ the king high school

Location
Huntersville, NC

Size
21,806 SQ FT

Architect
Boudreaux

INSTITUTIONAL

Located in Huntersville, NC, Christ The King High School underwent a major expansion and renovation project designed to enhance the student experience. With the addition of a 14,266 SF athletic and performance facility and over 7,000 SF in renovations, this state-of-the-art space features a full-size court and two cross courts in the gymnasium, expanded seating for more than 720 spectators, men’s and women’s locker rooms for home and visiting teams, and athletic director and trainers’ offices.

This new multi-purpose facility also caters to non-athletic-related events. A full-size stage with enhanced lighting and sound systems allow for elevated student performances and school-wide events and feature high-end systems including Audio Visual Performance, Intrusion Detection, Access Controls & Door Hardware, IT & Networking, and CCTV.

FLEXIBLE APPROACH THAT YIELDS COST-SAVING INITIATIVES
By engaging in a guided 18-month budgeting process, the client was able to save over $250K on this project without removing scope and with only slight variations to design elements. Early procurement methods to save against rising construction costs and utilizing methods including Pre-Engineered Metal Building (PEMB) Construction also allowed the client to save time on the project schedule.