New structural steel building with metal panel siding for chemical processing. Includes 2 floors of structural mezzanine and grating. Central bay open from the roof for bridge crane use. New shower / locker rooms and restrooms. Renovated the existing warehouse to include a new QA lab, storage rooms, maintenance shop, new main electrical room, and low voltage room. New 500 kW emergency backup generator.